Critical Pathway - Transportation and Travel

PATHWAY TWO:  TRANSPORTATION AND TRAVEL

Compendium Catholic Social Thought CHAPTER TEN:  SAFEGUARDING THE ENVIRONMENT

461. The biblical message and the Church's Magisterium represent the essential reference points for evaluating the problems found in the relationship between man and the environment.  The underlying cause of these problems can be seen in man's pretension of exercising unconditional dominion over things, heedless of any moral considerations which, on the contrary, must distinguish all human activity.

462. Nature appears as an instrument in the hands of man, a reality that he must constantly manipulate, especially by means of technology. A reductionistic conception quickly spread, starting from the presupposition — which was seen to be erroneous — that an infinite quantity of energy and resources are available, that it is possible to renew them quickly, and that the negative effects of the exploitation of the natural order can be easily absorbed. This reductionistic conception views the natural world in mechanistic terms and sees development in terms of consumerism. Primacy is given to doing and having rather than to being, and this causes serious forms of human alienation.

464. A vision of man and things that is sundered from any reference to the transcendent has led to the rejection of the concept of creation and to the attribution of a completely independent existence to man and nature. The bonds that unite the world to God have thus been broken. This rupture has also resulted in separating man from the world and, more radically, has impoverished man's very identity. Human beings find themselves thinking that they are foreign to the environmental context in which they live. The consequences resulting from this are all too clear: “it is the relationship man has with God that determines his relationship with his fellow men and with his environment. This is why Christian culture has always recognized the creatures that surround man as also gifts of God to be nurtured and safeguarded with a sense of gratitude to the Creator. Benedictine and Franciscan spirituality in particular has witnessed to this sort of kinship of man with his creaturely environment, fostering in him an attitude of respect for every reality of the surrounding world”.[975] There is a need to place ever greater emphasis on the intimate connection between environmental ecology and “human ecology”.[976]

465. The Magisterium underscores human responsibility for the preservation of a sound and healthy environment for all.[977] “If humanity today succeeds in combining the new scientific capacities with a strong ethical dimension, it will certainly be able to promote the environment as a home and a resource for man and for all men, and will be able to eliminate the causes of pollution and to guarantee adequate conditions of hygiene and health for small groups as well as for vast human settlements. Technology that pollutes can also cleanse, production that amasses can also distribute justly, on condition that the ethic of respect for life and human dignity, for the rights of today's generations and those to come, prevails”.[978]

466. Care for the environment represents a challenge for all of humanity. It is a matter of a common and universal duty, that of respecting a common good, destined for all, by preventing anyone from using “with impunity the different categories of beings, whether living or inanimate — animals, plants, the natural elements — simply as one wishes, according to one's own economic needs”.[980] It is a responsibility that must mature on the basis of the global dimension of the present ecological crisis and the consequent necessity to meet it on a worldwide level, since all beings are interdependent in the universal order established by the Creator. “One must take into account the nature of each being and of its mutual connection in an ordered system, which is precisely the ‘cosmos' ”.

467. Responsibility for the environment, the common heritage of mankind, extends not only to present needs but also to those of the future. “We have inherited from past generations, and we have benefited from the work of our contemporaries: for this reason we have obligations towards all, and we cannot refuse to interest ourselves in those who will come after us, to enlarge the human family”.[984] This is a responsibility that present generations have towards those of the future,[985] a responsibility that also concerns individual States and the international community.

470. Programs of economic development must carefully consider “the need to respect the integrity and the cycles of nature” [989] because natural resources are limited and some are not renewable. The present rhythm of exploitation is seriously compromising the availability of some natural resources for both the present and the future.[990] Solutions to the ecological problem require that economic activity respect the environment to a greater degree, reconciling the needs of economic development with those of environmental protection. Every economic activity making use of natural resources must also be concerned with safeguarding the environment and should foresee the costs involved, which are “an essential element of the actual cost of economic activity”.[991] In this context, one considers relations between human activity and climate change which, given their extreme complexity, must be opportunely and constantly monitored at the scientific, political and juridical, national and international levels. The climate is a good that must be protected and reminds consumers and those engaged in industrial activity to develop a greater sense of responsibility for their behavior.[992]

An economy respectful of the environment will not have the maximization of profits as its only objective, because environmental protection cannot be assured solely on the basis of financial calculations of costs and benefits. The environment is one of those goods that cannot be adequately safeguarded or promoted by market forces.[993] Every country, in particular developed countries, must be aware of the urgent obligation to reconsider the way that natural goods are being used. Seeking innovative ways to reduce the environmental impact of production and consumption of goods should be effectively encouraged.

Particular attention will have to be reserved for the complex issues surrounding energy resources.[994] Non-renewable resources, which highly-industrialized and recently-industrialized countries draw from, must be put at the service of all humanity. From a moral perspective based on equity and intergenerational solidarity, it will also be necessary to continue, through the contribution of the scientific community, to identify new sources of energy, develop alternative sources and increase the security levels of nuclear energy.[995] The use of energy, in the context of its relationship to development and the environment, calls for the political responsibility of States, the international community and economic actors. Such responsibility must be illuminated and guided by continual reference to the universal common good.